Photos

Kuthiran Tunnel Construction at NH Palakkad-Thrissur

The stretch is a vital part of the highway linking Palakkad and Thrissur. Mumbai-based Pragathi Engineering and Rail Project Private Limited has bagged the sub-contract for the Kuthiran tunnel construction at a cost of Rs.200 crore. Sources from the company, which had earlier done similar works for Mumbai-Pune Express Highway and Konkan Railway Corporation, said the tunnelling work would be completed in another six months.

As per the existing plan, the widening work would be completed by May 2017. In Kuthiran, there would be two tunnels and each would have 14 m width and 10 m height. New road overbridges would be built at Vadakkanchery, Mannuthy and Irumbu Palam.

Nisha Johnson

Recent Posts

Conow Unveiled Its AI Energy Solutions at SolarSolutions Düsseldorf 2025

DÜSSELDORF, GERMANY - Media OutReach Newswire - 5 December 2025 - Conow, a global AI…

1 hour ago

E3 Compression Latch with Visual Indicator Now Available in Zinc

HONG KONG SAR - Media OutReach Newswire - 5 December 2025 - Those prioritizing safety…

3 hours ago

Global Qualifications Made Local: Leading Overseas Universities Partner with SIM

SINGAPORE - Media OutReach Newswire - 5 December 2025 - For students seeking an international…

4 hours ago

Yunnan Showcases Top 10 Must-try Experiences at Trip.Best: Southeast Asia Travel Trends Unpacked

SHANGHAI, CHINA - Media OutReach Newswire - 4 December 2025 - On December 2, 2025,…

15 hours ago

China’s REIT Market Accelerates Growth, Signaling a New Era for Real Estate Investment

Cushman & Wakefield Experts Share Market Insights at MIPIM Asia SummitHONG KONG SAR - Media…

16 hours ago

Dah Sing Bank Unveils 24-Hour US Stock Trading Service

Seamless Access Across Time Zones with Preferential Brokerage FeeHONG KONG SAR - Media OutReach Newswire…

18 hours ago