Photos

Kuthiran Tunnel Construction at NH Palakkad-Thrissur

The stretch is a vital part of the highway linking Palakkad and Thrissur. Mumbai-based Pragathi Engineering and Rail Project Private Limited has bagged the sub-contract for the Kuthiran tunnel construction at a cost of Rs.200 crore. Sources from the company, which had earlier done similar works for Mumbai-Pune Express Highway and Konkan Railway Corporation, said the tunnelling work would be completed in another six months.

As per the existing plan, the widening work would be completed by May 2017. In Kuthiran, there would be two tunnels and each would have 14 m width and 10 m height. New road overbridges would be built at Vadakkanchery, Mannuthy and Irumbu Palam.

Nisha Johnson

Recent Posts

Champions League: Demichelis-led RB Leipzig host Man City in must-win League Phase tie

The RB Leipzig vs Man City Champions League tie went ahead on Wednesday, November 4,…

4 seconds ago

Cyclone Murasu weakens into well-marked low-pressure area; Andhra counts two dead

It took a week of weakening, but the India Meteorological Department has stopped calling Murasu…

29 minutes ago

Rinky Hijikata beats Novak Djokovic from a set down in Paris Masters Round 2

Rinky Hijikata came back from a set down to beat Novak Djokovic in the Round…

58 minutes ago

GIFT Nifty’s 23.5-hour trading made its cues faster, not calmer

GIFT Nifty's signals were meant to get calmer once traders had 23.5 hours to act…

2 hours ago

Manish Goel Makes Bigg Boss 20 Headlines as Corporate Leadership Shifts Unfold

Actor Manish Goel has taken center stage on national television after entering the Salman Khan-hosted…

2 hours ago

Liverpool chase fourth straight win at Fenerbahce on difficult Istanbul trip

Liverpool play Fenerbahce at the Sukru Saracoglu Stadium on Wednesday, November 4, in a 2026-27…

2 hours ago