The stretch is a vital part of the highway linking Palakkad and Thrissur. Mumbai-based Pragathi Engineering and Rail Project Private Limited has bagged the sub-contract for the Kuthiran tunnel construction at a cost of Rs.200 crore. Sources from the company, which had earlier done similar works for Mumbai-Pune Express Highway and Konkan Railway Corporation, said the tunnelling work would be completed in another six months.
As per the existing plan, the widening work would be completed by May 2017. In Kuthiran, there would be two tunnels and each would have 14 m width and 10 m height. New road overbridges would be built at Vadakkanchery, Mannuthy and Irumbu Palam.
Reinforcing Thailand’s position as a trusted, high-quality destination through emotion-driven storytellingBANGKOK, THAILAND - Media OutReach…
SINGAPORE - Media OutReach Newswire - 30 January 2026 - Digital transformation has become an…
HONG KONG SAR - Media OutReach Newswire - 30 January 2026 - On January 27,…
HONG KONG SAR - Media OutReach Newswire - 30 January 2026 - Madame Tussauds Hong…
BANGKOK, THAILAND - Media OutReach Newswire - 30 January 2026 - Amid heightened volatility across…
CHONGLI, CHINA - Media OutReach Newswire - 30 January 2026 - The "2026 Chongli Forum"…