The stretch is a vital part of the highway linking Palakkad and Thrissur. Mumbai-based Pragathi Engineering and Rail Project Private Limited has bagged the sub-contract for the Kuthiran tunnel construction at a cost of Rs.200 crore. Sources from the company, which had earlier done similar works for Mumbai-Pune Express Highway and Konkan Railway Corporation, said the tunnelling work would be completed in another six months.
As per the existing plan, the widening work would be completed by May 2017. In Kuthiran, there would be two tunnels and each would have 14 m width and 10 m height. New road overbridges would be built at Vadakkanchery, Mannuthy and Irumbu Palam.
QBA 2024 Announces 35 Finalists Competing for Hong Kong's Highest Honour in the Building Industry…
SINGAPORE - Media OutReach Newswire - 17 May 2024 - UXLINK, the Web3 social platform…
DUBLIN--(BUSINESS WIRE)--The "Australia Construction Market Size, Trend Analysis by Sector, Competitive Landscape and Forecast to…
Three-part podcast interview features The mechanism of action of ANKTIVA® activating NK cells, Killer T…
EAST BRUNSWICK, N.J. & BENGALURU, India--(BUSINESS WIRE)--$WIPRO #AIprinciples--Wipro Limited (NYSE: WIT, BSE: 507685, NSE: WIPRO),…
THOMASVILLE, Ga.--(BUSINESS WIRE)--Cleaver-Brooks announces that it has been acquired by Miura Co., Ltd., a leading…